24 hour emergency electrician Typical response 1 hour across Medway 07366 354 116

Local service

EV Charger Installation in Strood

We install certified EV chargers across Strood from £1,000, including parts, labour, testing and certification. Before quoting, we assess your driveway, terrace or flat parking, cable route, earthing, consumer unit capacity and any landlord or grant requirements. Eligible OZEV routes may reduce customer costs to around £500. We fit suitable isolation, protective devices and load management where needed, then demonstrate safe use. Below, we explain costs, permissions, timescales and local property considerations.

Wall-mounted EV chargepoint fitted to the outside of a brick house
EV chargepoint installation
  • NICEIC approved
  • Part P registered
  • £5m public liability
  • 12-month workmanship guarantee
  • Fixed price before we start
EV Charger Installation in Strood

This service in Strood

EV car charger installation from £1,000 (typical grant-reduced cost ~£500) including parts, labour and certification. This service covers Strood and nearby areas in Medway borough. Work is completed to current wiring regulations with written fixed pricing, certification and a satisfaction guarantee.

The property mix in Medway — dense Victorian terraces in Strood, Chatham and Gillingham, dockyard-era housing, large post-war estates and new-build on the riverside and at Rochester Riverside — means no two jobs are alike. Our electricians spend much of their time on dense rental and HMO stock across five towns, landlord EICRs and fire alarms, riverside new-build snagging and EV chargers, and we plan each visit around the age of the wiring rather than a one-size-fits-all checklist.

Why Strood homes and landlords ask for it

That localised approach reduces the risks we commonly see here when residents of Strood have tried to charge long-term using unsuitable extension leads or rear sockets on older wiring.

Around Medway the housing we see most is dense Victorian terraces in Strood, Chatham and Gillingham, dockyard-era housing, large post-war estates and new-build on the riverside and at Rochester Riverside. That shapes the work we are called to: dense rental and HMO stock across five towns, landlord EICRs and fire alarms, riverside new-build snagging and EV chargers. Every job is priced in writing before we start, and the same NICEIC standards apply whether the property is a period terrace or a new-build flat.

What it costs in Strood

Once we’ve confirmed the parking layout, supply capacity and cable route at your Strood property, we’ll give you a fixed written price before work starts. A fitted chargepoint starts from £1,000 (including VAT, parts, labour, testing and certification); eligible applicants may pay about £500 after OZEV EV grants.

Job Price What's included
EV chargepoint From £1,000 Fitting, testing, certificate
Qualifying grant route About £500 OZEV grant applied
Consumer unit replacement £500–£700 Parts, labour, certification
Fault finding £80/hr Safety diagnosis
Supply upgrade Quoted separately DNO work where needed

Prices exclude plaster repairs, decoration, asbestos removal, DNO charges and access equipment.

How quickly we can book you in

Usually within 3–7 working days once the survey is complete. We’ll confirm the earliest suitable installation slot after checking your Strood parking arrangement, proposed cable route, consumer unit capacity and any OZEV grant requirements. Booking speed depends on the survey information, chargepoint model, distribution network considerations and whether remedial electrical work is needed before fitting.

We’ll advise honestly on same‑day availability where a straightforward installation can be safely planned, but we won’t compromise testing, certification or grant evidence to rush work. Weekend slots are available within our Monday–Saturday operating hours, subject to existing bookings and material availability.

Before confirming a date, we’ll establish the required protective devices, earthing arrangement, load management and cable containment. If you’re applying for an OZEV‑supported installation, we’ll check eligibility and required documents early, helping avoid delays caused by incomplete tenancy, parking or property‑owner permissions.

Streets and property types we know in Strood

Where parking is communal at blocks on the newer estates or a flat in a leasehold building in Strood village centre, we’ll identify whether local permissions from Strood Parish Council or the Medway Borough conservation officers are required and whether an OZEV grant route may apply for that specific Strood property.

The full service, step by step

With the property survey complete, we’ll provide a fixed written quotation and a clear installation plan for your Strood EV chargepoint. Our site survey confirms cable routes, earthing arrangements, consumer unit capacity, isolation requirements and charger location, while identifying any landlord, freeholder or listed-building permissions needed.

Before work begins, we’ll check grant eligibility where applicable and make certain the proposed equipment meets current smart-charge requirements. On installation day, we follow an installation checklist: isolate circuits safely, install containment and protective devices, connect the chargepoint, label the new circuit and test operation.

We then complete electrical verification, confirm protective-device performance and issue the appropriate certification. We’ll show you safe charging use, explain the app or controls, and leave the work area tidy. Our written price includes parts, labour and certification.

What it costs

JobWhat is includedPrice inc. VAT
EV chargepoint, fittedAbout £500 after the OZEV grant where you qualifyfrom £1,000
Consumer unit (fuse box) replacementBoard, RCBO/RCD protection, testing, certificate£500–£700
Extra socketSupply, fitting and testing£55–£75
EICR, up to 3-bedFull inspection, test results and report£150–£250
Fault findingMost faults traced in 1–2 hours£80/hr

All prices include VAT, parts, labour, testing and the certificate. Not included: making good plaster and decoration, asbestos removal, DNO charges for a supply upgrade, scaffold or access equipment. Fixed price in writing before we start — the bill is never larger than the quote.

Where we work in Strood

Frequently asked questions

How much does it cost to install an electric car charger at home?

£1,000–More for extras. A standard installation starts from about £1,000 including VAT, labour and certification, but trenching, longer cable runs or consumer-unit upgrades can increase the fixed quote.

Can I get a grant to help pay for a home charger?

Yes. Grants may reduce eligible installations, especially for flats, landlords and tenants with off‑street parking; we’ll confirm current eligibility before work starts.

Will my house wiring handle a charger?

No—maybe. We’ll assess your consumer unit, earthing and available load and confirm if upgrades or limits are needed before fitting.

How long does it take to install a charger?

A few days to weeks. Timelines depend on the survey, equipment availability and any required network approval.

Will installing a charger overload my electrical circuits?

No. We won’t overload circuits; protective devices, isolation and testing will be fitted to meet current wiring rules.

Do I get certification after installation?

Yes. On completion we provide the required electrical certification and explain safe use, load-management settings and simple checks.

Get a fixed price

Ring us or send a photo of the job. We give a fixed price in writing before any work starts, and the bill is never larger than the quote.

Call 07366 354 116 · 24hr