24 hour emergency electrician Typical response 1 hour across Medway 07366 354 116

Fixed prices in writing

Distribution Board Upgrades in Medway

We upgrade distribution boards across Medway, including Strood, Blue Bell Hill, Brompton and Walderslade, with NICEIC-approved, Part P-registered work. Before replacement, we assess earthing, bonding, circuit condition and protective-device suitability, then agree a planned isolation window, typically two to six hours. We test throughout, label circuits and provide certification, test results and schedules for future inspections. Fixed written pricing follows inspection, with defects clearly documented. Below, we explain costs, planning and period-property considerations.

Three-phase distribution board in a commercial plant room
Commercial and industrial electrical work
  • NICEIC approved
  • Part P registered
  • £5m public liability
  • 12-month workmanship guarantee
  • Fixed price before we start
Distribution Board Upgrades in Medway

What we do and who it is for

Consumer unit upgrades and replacements from £XXX — fixed written prices before work starts. Serving Medway and surrounding areas including Strood, Luton, Brompton, Blue Bell Hill and Walderslade. Work is NICEIC approved and Part P registered, with guarantees and appropriate electrical certification supplied on completion.

Typical jobs

  • Clear certification for your records and for future inspections by Medway Borough Council, especially for conversions in Brompton.
  • Reduced concern about ageing aluminium connections commonly found in 1950s social housing on the post-war estates.

We isolate safely at the property, label circuits clearly for the homeowner in Medway, test the completed installation, and issue the relevant electrical certification required locally.

What it costs

Before any consumer unit upgrade in Medway we’ll inspect the installation, confirm the required work and provide a fixed written price. Below are typical charges, with what’s included for each job.

Job Price What's included
Consumer unit replacement £500–£700 Supply and fitting of new consumer unit, labour, VAT, testing and certification
Fault finding £80/hour Diagnostic work to locate electrical faults (labour only)
EICR, up to three bedrooms £150–£250 Full electrical inspection and condition report for properties up to three bedrooms

Not included: making good plaster/decoration, asbestos removal, DNO supply‑upgrade charges, scaffold or specialist access equipment (unless specified).

How the work is planned

Once we’ve assessed the existing installation, we’ll plan the consumer unit upgrade around the property’s circuits, earthing arrangement, cable condition and required protection, identifying any defects that must be resolved before replacement. Our site survey confirms circuit use, meter positions, isolation arrangements, access constraints and whether ageing VIR, rubber or aluminium conductors affect the scope.

We’ll agree a suitable shutdown window with you, allowing for essential appliances, alarms, home working or business operations. For managed premises, stakeholder meetings help us coordinate access, keyholders and any vulnerable occupants. We’ll identify circuits requiring temporary isolation, protect working areas and confirm where the new consumer unit can be installed safely. Before attendance, we’ll set out the planned sequence, expected interruption and any preparatory work, so risks are controlled and disruption is kept proportionate.

Compliance and documentation

Compliance is integral to every consumer unit upgrade, and we will carry out the inspection, testing and certification required to meet current electrical safety standards. We will check protective devices, circuit identification, earthing and bonding, polarity, insulation resistance and test results, and issue the appropriate certification; clear records support regulatory traceability and help show what was installed, tested and found at the time of the work.

For commercial premises there is no statutory interval for an EICR, despite a common belief that one is legally mandated; the IET Guidance Note 3 recommends typical review intervals (for example, five years for offices, three years for industrial premises and annual checks in some higher‑risk environments). The legal duty is to maintain systems so as to prevent danger under the Electricity at Work Regulations 1989; insurers, landlords and licensing bodies may request current reports, so retaining documentation is advisable.

Minimal disruption and out-of-hours working

We’ll plan a consumer unit upgrade around your occupancy, isolating supplies only when necessary and keeping downtime as short as safe working permits. Before work starts, we’ll confirm critical loads, access arrangements and any equipment that must be shut down safely. We’ll protect adjacent finishes, maintain clear escape routes and control dust while existing circuits are identified and tested.

Where a daytime isolation would cause unacceptable interruption, we can discuss out of hours working, subject to safe access, adequate lighting and a realistic testing period. Noise minimisation includes preparing materials in advance, limiting drilling and avoiding unnecessary movement through occupied areas. We won’t rush energisation: circuit verification, protective-device testing and labelling must be completed before the installation is returned to service. You’ll receive clear notice of each planned interruption and completion confirmation.

Premises and sites around Medway

Across Medway we upgrade consumer units in Victorian terraces around the town centre and Brompton, assessing ageing VIR or rubber-insulated cables commonly found in terraces built in the late 19th century before specifying replacement equipment. In newer developments on the outskirts of Strood and Blue Bell Hill, where homes were built from the 1990s onwards, we review modern housing wiring and consumer unit layouts to confirm they meet current earthing arrangements. For every job in Medway you’ll receive documentation tailored to the property: certification and circuit schedules that record the upgraded consumer unit and its location, so the work is properly recorded and traceable.

What it costs

JobWhat is includedPrice inc. VAT
EICR, up to 3-bedFull inspection, test results and report£150–£250
EICR, 4–5 bedFull inspection, test results and report£250–£350
PAT testingMinimum visit £80from £1.50/item
Consumer unit (fuse box) replacementBoard, RCBO/RCD protection, testing, certificate£500–£700
Out-of-hours emergencyFirst hour minimum, 24 hours a day£120/hr

All prices include VAT, parts, labour, testing and the certificate. Not included: making good plaster and decoration, asbestos removal, DNO charges for a supply upgrade, scaffold or access equipment. Fixed price in writing before we start — the bill is never larger than the quote.

Frequently asked questions

1) Will my power go off when you replace the fuse box?

Yes — we plan isolation to minimise downtime, test while the supply is off, and only restore power after verification. We’ll tell you the expected outage time before starting.

2) How long will the power be off?

Typically 2–6 hours — depending on the existing wiring condition and any remedial work found during replacement. We give a fixed time estimate before work begins.

3) Will you find problems with my old wiring?

Yes — replacing the unit can reveal faults in old wiring like rubber, aluminium, or uninsulated cable. We’ll explain any issues and recommend repairs before completing the job.

4) Will I get paperwork when the job is done?

Yes — you’ll receive the Electrical Installation Certificate, test results, and Building Regulations notification if required. Keep these for insurance and future work.

5) Do you give a fixed price before starting?

Yes — we assess the existing installation first and provide a fixed written price before any work begins, including any recommended remedial work costs.

6) Will you mark safety switches and leave records?

Yes — we label protective devices and provide circuit schedules and inspection information. We do not hide defects or certify untested work.

Get a fixed price

Ring us or send a photo of the job. We give a fixed price in writing before any work starts, and the bill is never larger than the quote.

Call 07366 354 116 · 24hr