Commercial Solar in Medway

Commercial solar in Medway can be worthwhile when your premises use electricity during daylight hours, as we size systems to reduce imported power rather than rely on low-value exports. We survey the roof, supply capacity, shading, access, metering and any planning or DNO constraints, then provide a fixed written price covering design, equipment, installation, testing and commissioning. Costs vary with array size, roof condition, civils and connection work. Below, we explain likely costs, disruption, compliance and payback factors.

Newly installed consumer unit with RCBO protection in a Kent home
Domestic electrical installation
  • NICEIC approved
  • Part P registered
  • £5m public liability
  • 12-month workmanship guarantee
  • Fixed price before we start
Commercial Solar in Medway

What we do and who it is for

Commercial solar PV design and installation for businesses, landlords and agricultural sites, with fixed written prices covering equipment, labour, testing and certification. Serving Medway and the ME2 area, including warehouses, offices, retail premises and industrial units. All installations carry full electrical certification and warranty-backed guarantees; proposals include tailored system sizing, optional battery storage, export metering and monitoring where they improve returns.

Typical jobs

  • Panel maintenance plans, inspections and fault checks are written to match access arrangements and roof ages in Medway: pitched Victorian slate roofs in the town centre, mid‑20th century metal roofs on Warehousing Park, and flat membrane roofs on newer retail extensions.

Around Medway the housing we see most is dense Victorian terraces in Strood, Chatham and Gillingham, dockyard-era housing, large post-war estates and new-build on the riverside and at Rochester Riverside. That shapes the work we are called to: dense rental and HMO stock across five towns, landlord EICRs and fire alarms, riverside new-build snagging and EV chargers. Every job is priced in writing before we start, and the same NICEIC standards apply whether the property is a period terrace or a new-build flat.

What it costs

Commercial solar costs in Medway are quoted per job after a free survey, as final price depends on roof condition, array size, access, supply capacity and any battery requirement. Below are typical charges and what each price covers.

Job Price What's included
Commercial solar installation Quoted per job after a free survey Parts, labour, testing, certification and VAT
Commercial EICR £30–£50 per circuit Inspection, testing and report
Supply fault finding £80/hour Labour; most faults traced in 1–2 hours

Not included: scaffold, specialist access equipment, DNO supply-upgrade charges, asbestos removal, plaster repairs and decoration.

How the work is planned

We start with a free site survey to assess roof condition, usable area, shading, access, existing electrical supply and your daytime demand. We then model likely generation against half-hourly consumption, size the array and inverter, and identify whether battery storage improves payback.

Before scheduling, we agree working hours, delivery routes, scaffold locations and isolation requirements with your facilities team. Project phasing keeps trading areas operational where possible: we can complete roof works, cabling and final connection in planned stages. Stakeholder coordination covers building managers, tenants, roof contractors and network contacts, so access and shutdowns are controlled rather than costly surprises.

We provide a fixed written scope showing equipment, programme, exclusions and payment stages. If surveys reveal roof repairs, switchgear upgrades or restricted access, we price these separately before work begins.

Compliance and documentation

For a Medway solar installation, we’ll provide the electrical certification, commissioning records and inverter/generation documentation needed for handover, insurer enquiries and future maintenance. Retain this legal and contractual paperwork with system warranties, design information and any distribution-network approvals to help with future fault diagnosis, insurance claims and asset management.

We’ll also advise proportionate maintenance schedules: visual checks, inverter monitoring, generation reviews and periodic inspection of associated electrical equipment. Commercial fixed-wire testing does not have a single statutory interval; commonly used frequencies (for example, five-year for offices, three-year for some industrial premises, or annual for high-risk environments) come from IET Guidance Note 3 as recommended practice rather than a legal requirement.

The Electricity at Work Regulations 1989 require that electrical systems are maintained so as to prevent danger. An up-to-date EICR is not universally legally mandatory but may be requested by insurers, landlords or licensing bodies, so we’ll help align records with those requirements.

Minimal disruption and out-of-hours working

Planning commercial solar works around your operating hours helps us reduce downtime, protect access routes and keep installation costs controlled. We’ll agree delivery windows, roof-access arrangements, isolation periods and safe work zones before work starts, so staff, customers and vehicles can continue moving safely.

For occupied premises, phased installs can separate roof mounting, cable containment, inverter installation and commissioning into manageable stages. This limits the length of any electrical shutdown and allows us to coordinate with your facilities team.

Where practical, we can schedule noisier tasks or final changeover out of hours. Out-of-hours labour is charged at £120 per hour, compared with £80 per hour during standard working time, so we’ll only recommend it where avoided disruption justifies the added cost. Fixed pricing sets these arrangements out clearly before installation begins.

Premises and sites around Medway

A technically viable site in areas with old sewer runs or contaminated infill — frequently encountered in former quarry or riverside industrial land by the Medway — can still be uneconomic if electrical reinforcement or extensive civils work is required. We’ll identify those area‑specific costs early and provide a fixed written price before work begins.

What it costs

JobWhat is includedPrice inc. VAT
EICR, up to 3-bedFull inspection, test results and report£150–£250
EICR, 4–5 bedFull inspection, test results and report£250–£350
PAT testingMinimum visit £80from £1.50/item
Consumer unit (fuse box) replacementBoard, RCBO/RCD protection, testing, certificate£500–£700
Out-of-hours emergencyFirst hour minimum, 24 hours a day£120/hr

All prices include VAT, parts, labour, testing and the certificate. Not included: making good plaster and decoration, asbestos removal, DNO charges for a supply upgrade, scaffold or access equipment. Fixed price in writing before we start — the bill is never larger than the quote.

Frequently asked questions

How much will a commercial solar system cost?

A number: We’ll give a fixed written quote covering design, equipment, installation, testing and commissioning. Final payback depends on your daytime use, energy prices, funding and export payments, not just system size.

How long will it take to pay back the solar system?

A number: Payback varies with how much daytime electricity you use, your tariffs, any funding and export income. We’ll model likely payback using your actual consumption and costs.

Can I add batteries later?

Yes: Usually you can if batteries will increase self-use or cut peak charges. We’ll model battery benefit against capital cost and advise whether it’s worth it.

Will the grid let me connect my system?

Yes or no: We’ll identify the required network application, metering and protection arrangements and handle approvals before work starts, so you’ll know if connection is allowed and any limits.

Do you guarantee how much electricity the system will produce?

No: We’ll explain manufacturer warranties and expected annual output and provide monitoring, but forecasts are realistic estimates, not absolute contractual guarantees.

Will installation disrupt my business?

Yes or no: Installation sequencing can minimise downtime; we’ll plan works to reduce disruption, explain any short outages or access needs, and keep installations as quick and quiet as possible.